LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 650i 2D Convertible, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 49 (Drive Shafts & Universal Joints) >> Removal & Installation >> Drive Shaft Constant Velocity (CV) Joint >> Installation

Drive Shaft Constant Velocity (CV) Joint: Installation

WARNING: This page does not describe the selected car, but rather 22 other vehicles, including the 2001 BMW 540i, 2001 BMW 530i, 2001 BMW 525i, 2001 BMW 330xi, and 2001 BMW 330i. However, it is still accessible from the selected car via links, so may be relevant.
  1. Fill new CV joint with grease. Clean grease off splines. Apply Loctite to splines.
    CAUTION: DO NOT get Loctite into ball grooves. DO NOT tilt inner race and cage, as CV joint balls could fall out.
  2. Drive CV joint onto drive shaft. Install circlip. Pull boot onto drive shaft. Install hose clamp on boot. To complete installation, reverse removal procedure.
Fig 1: Removing Circlip
G97A08483Courtesy of BMW OF NORTH AMERICA, INC.