34 52 525 Replacing one front pulse generator
WARNING: This page is about a different car, the 2005 BMW 645Ci and 2004 BMW 645Ci. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
Read and comply with notes on protection against electrostatic damage (ESD protection), refer to 61 35 ... NOTES ON ESD PROTECTION (ELECTRO STATIC DISCHARGE)
.
NOTE:
Read and comply with General Information, refer to 34 00 ... GENERAL INFORMATION .
Observe safety instructions on raising the vehicle, refer to 00 .. ... LIFTING VEHICLE WITH A LIFTING PLATFORM .
Observe safety instructions on raising the vehicle, refer to 00 .. ... LIFTING VEHICLE WITH A LIFTING PLATFORM .
Open plug housing (1), pull plug connection (2) out of bracket and disconnect.
Pull cable with rubber grommet out of bracket on spring strut.
Installation:
- Ensure proper locking of plug connector and proper seating of rubber grommets.
Release hexagon socket head cap screw (1) and pull wheel speed sensor out of bore.
Installation:
Tightening torque, refer to 31 51 6AZ in BRAKES - TIGHTENING TORQUES - 645CI .
Clean bore hole for pulse generator and grease with Staburags NBU 12/K lubricating grease (refer to OPERATING FLUIDS - BRAKES ).