LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 650i 2D Convertible, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 2291 (Collision - Body Panel Repair (E60) M5) >> Support Members >> 41 11 516 Replace Left Carrier Support (Partial Replacement, Front Side Panel Removed)

41 11 516 Replace Left Carrier Support (Partial Replacement, Front Side Panel Removed)

WARNING: This page is about a different car, the 2010 BMW M5, 2009 BMW M5, 2008 BMW M5, 2007 BMW M5, and 2006 BMW M5. However, it is still accessible from the selected car via links, so may be relevant.

Read contents of BODY, GENERAL  and observe relevant procedures.

The reduced-weight aluminum front end structure (GRAV) is used on this vehicle.

Place vehicle on straightening bench.

NOTE: Damaged support carriers without cracks, sharp-edged damage or holes can be straightened. After repair work, check support carrier again for cracks.

Observe FRAME ALIGNMENT CONTROL BODY DIMENSIONS !

Following new body parts are required:

Open riveted joints in areas (1).

Open EMC WELD SEAM  in area (1).

Installation: 

Carry over hole pattern from engine carrier to engine mounting in area (1).

Fig 2: Open Riveted Joints In Areas
G05503246Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 2 EMC SCREWS  in areas (1).

Use 2 EMC SCREWS  in areas (3).

If an engine carrier partial replacement has been carried out, 2 EMC SCREWS  must be used in areas (2).

Fig 3: Identifying EMC Screw Areas
G05503247Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: View from above

Mark severance cut in accordance with measurements a and b and cut support carrier at top.

Measurement a =77 mm from recess

Measurement b =215 mm from center of bore

Fig 4: Mark Severance Cut In Accordance With Measurements "A" And "B" And Cut Support Carrier At Top
G05503248Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: View from below

Mark severance cut in accordance with measurement a and cut support carrier at bottom.

Measurement a =57 mm parallel to edge of spring support at front

Fig 5: Measurement "a" = 57 mm Parallel To Edge Of Spring Support At Front
G05503249Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Carry over bores from engine carrier to new part in areas (1).

Adapt new part with straightening attachment or universal mount in area (2).

Drill through new part and engine carrier together.

Use 4 rivets (size 13) in areas (1).

IMPORTANT: If a partial replacement has already been carried out on the engine carrier, rivets (size 15) must be used in areas (1).
Fig 6: Adapt New Part With Straightening Attachment Or Universal Mount In Area (2)
G05503250Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Drill out rivets with 4 mm dia.

Drill holes for 6 rivets  in area (1).

Drill holes for 5 rivets  in area (2).

Drill through all holes through both parts together.

Coat all contact faces with adhesive  .

Join parts and rivet.

Fig 7: Identifying Drill Hole Rivet Area
G05503251Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 2 EMC SCREWS  after bonding new parts in areas (1).

Fig 8: Identifying EMC Screws Areas
G05503252Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Left side only:

Rivet down blind rivet nut 41 32 8 257 508 in bore (1).

Fig 9: Rivet Down Blind Rivet Nut 41 32 8 257 508 In Bore (1)
G05503253Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Right side only:

Rivet down blind rivet nut 41 12 8 223 082 in bore (1).

Fig 10: Rivet Down Blind Rivet Nut 41 12 8 223 082 In Bore (1)
G05503254Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Seal cutting line and rivets with sprayable body sealing compound

Spray gun required for body sealing compound (order no. 81 49 0 300 887).

Different riveting-down elements, depending on the equipment specification, must be mounted on the new component.