LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 650i 2D Convertible, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 2025 (Fuel System - Repair) >> Injection Nozzle >> 13 53 158 Removing and installing/replacing high-pressure rail (N53, N54, N54T)

13 53 158 Removing and installing/replacing high-pressure rail (N53, N54, N54T)

WARNING: This page is about a different car, the 2010 BMW 135i, 2009 BMW 135i, and 2008 BMW 135i. However, it is still accessible from the selected car via links, so may be relevant.

Special tools required: 

WARNING: Observe warning on cylinder head cover.
Disconnect battery negative terminal  (risk of fire due to short-circuiting on removal). See 12 00... INSTRUCTIONS FOR DISCONNECTING AND CONNECTING BATTERY (CONVERTIBLE) or 12 00... INSTRUCTIONS FOR DISCONNECTING AND CONNECTING BATTERY (COUPE).
Electric fuel pump starts up automatically each time door is opened!
Carry out installation work on fuel system only with coolant temperature below 40°C.
IMPORTANT: Wear full face guard and protective gloves.
Fuel can emerge spontaneously at high velocity when the high-pressure line is released!
IMPORTANT: Adhere to conditions of absolute cleanliness when working on the high-pressure fuel system.
Introduced contaminants can cause malfunctions in the system!
  • Do not allow any dirt particles or foreign bodies to get into the system.
  • Remove all traces of dirt before removing pipes or individual components.
  • Use only fluff-free cloths.
  • Seal all fuel system openings with protective caps or plugs.
IMPORTANT:

When working on the oil, coolant or fuel circuit, you must protect the alternator against dirt contamination.

Cover alternator with suitable materials.

Failure to comply with this procedure may result in an alternator malfunction.

Necessary preliminary tasks: 

Recycling:  Fuel escapes when fuel lines are detached. Catch and dispose of escaping fuel in a suitable container. Observe country-specific waste disposal regulations.

Unlock connector (1) and remove. Pull the connector holder off the high pressure rail. Remove all holders for the wiring harness from the high pressure rail.

Fig 1: Identifying Plug
G05501974Courtesy of BMW OF NORTH AMERICA, INC.

Unlock connector (1) and remove. Slacken nut (2). Release screws (3) and remove high-pressure rail (4).

Fig 2: Identifying Plug, Nut, Screws And High-Pressure Rail
G05501975Courtesy of BMW OF NORTH AMERICA, INC.

Installation of high pressure rail:  The installation of the high pressure rail is described separately from removal.

Install high pressure rail (4) while manually tightening screws (3) and nut (2).

NOTE:

High pressure rail must still be displaceable on cylinder head.

Nut (2) must be able to be screwed on easily by hand.

Push on connector for high pressure sensor (1).

Fig 3: Identifying Plug, Nut, Screws And High-Pressure Rail
G05501975Courtesy of BMW OF NORTH AMERICA, INC.

Fitting pressure lines: (Same procedure for all pressure lines) Connect pressure line (1), tightening nuts hand-tight only in the process.

IMPORTANT: Connect pressure line (1) without tension only. To ensure distortion-free installation of the pressure line and to avoid damaging the thread, it must be possible for both nuts to be screwed on easily by hand! If the nuts cannot be easily screwed on by hand, the injector must be turned into the installation position  .
Fig 4: Connecting Pressure Line
G05501977Courtesy of BMW OF NORTH AMERICA, INC.

Description of "Turning injector into installation position" in the following operation.

Only if one injector has to be turned into installation position: 

Fig 5: Turning Injector
G05501978Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Do not under any circumstances pull injector out of bore hole! If the injector is pulled out of the bore hole, the PTFE sealing ring must be replaced !

Tighten down screws (1). Tightening torque 13 53 1AZ. Tighten nut (2). Tightening torque 13 53 7AZ. .

Fig 6: Identifying Screws And Nut
G05501979Courtesy of BMW OF NORTH AMERICA, INC.

Tighten down screw for hold-down device (1). Tightening torque 13 53 5AZ.

NOTE: This operation is only necessary if one of the hold-down device has been slackened beforehand.
Fig 7: Identifying Holding-Down Element With Screw
G05501980Courtesy of BMW OF NORTH AMERICA, INC.

Adhere to tightening sequence:

When tightening nut (1) on injector, grip hexagon head of injector with wrench (3).

Tighten down nuts with special tool 37 1 151.

Fig 8: Identifying Nuts And Wrench
G05501981Courtesy of BMW OF NORTH AMERICA, INC.

Tightening torque 13 53 8AZ.

Assemble engine. Check fuel system for tightness. Check function of DME.