11 21 531 Replacing All Crankshaft Main Bearings (N54): Notes
Special tools required:
- 00 2 590
- 11 4 470
- 11 8 510
For the following special tools, refer to MAINTENANCE AND GENERAL INFORMATION - SPECIAL TOOLS .
For the following special tools, refer to ENGINE- SPECIAL TOOLS .
Aluminum screws/bolts are permitted with and without color coding (blue). For reliable identification: Aluminum screws/bolts are not magnetic . Jointing torque and angle of rotation must be observed without fail (risk of damage) .
Necessary preliminary tasks:
- Remove crankshaft . See 11 21 500 REPLACING CRANKSHAFT (N54) .
Check setting of oil spray nozzles, adjusting if necessary:
Attach special tool 11 8 510 to bolt connection on main bearing and secure with bolt (1).
Installation:
Oil nozzle must be located precisely in groove of special tool 11 8 510.
If necessary, adjust oil nozzle.
Adjust oil nozzle.
Release screw (1).
Tightening torque. See 11 11 5AZ in 11 11 ENGINE BLOCK .
Remove bearing shells (2) and (3).
Observe bearing classification .
Installation:
Bearing shell (1) with lubricant groove must be fitted in crankcase upper section.
Bearing shell (2) without lubricant groove must be fitted in crankcase lower section (bedplate).
Bearing point 1 is at the front on the timing chain drive in the direction of travel.
Main bearing classification (1) for crankcase lower half (bedplate), code numbers 1 2 3, see table.
Observe bearing classification . See ENGINE - TECHNICAL DATA .
Bearing classification (2) of connecting rods code letters b and r. See 11 24 571 REPLACING ALL CONNECTING ROD BEARINGS (N54) .
Main bearing classification (1) in crankcase, code letters A/B or C, see table.
Installation:
When all the letters and number code have been determined, the bearing shell color must be allocated.
Installation:
The letter/number combination produces a bearing shell pairing.
Identification by different colors.