32 41 037 Removing and installing power steering pump for power steering gear with Dynamic Drive (N54)
SECURE ENGINE IN INSTALLATION POSITION to prevent it from falling down.
Seal off hydraulic lines with plugs.
When replacing power steering pump:
FLUID RESERVOIR must be replaced in event of metal abrasion, sluggish pump shaft or increased wear!
The filter integrated in the fluid reservoir can only absorb a limited amount of foreign particles. If the filter clogs, the hydraulic system can no longer be sufficiently protected.
Metal abrasion is perceived in the fluid reservoir as metallically glittering hydraulic fluid.
It is only necessary to replace the fluid reservoir because of leaks (e.g. at hose connections) only in the event of the unavoidably high ingress of dirt.
Necessary preliminary tasks:
- Draw off and dispose of hydraulic fluid from fluid reservoir
- Remove BELT PULLEY
- Lower FRONT AXLE CARRIER
Release bolts (1).
Tightening torque 32 41 5AZ .
Release banjo bolt (2) and disconnect Dynamic Drive pressure line (3) with bracket from power steering pump.
Installation:
Replace all sealing rings.
Make sure hydraulic line is laid without tension and with sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ .
Release hose clamp (2) and detach suction line from power steering pump.
Installation:
Markings (1) on suction line and power steering pump connection must match up.
Version with active front steering: Disconnect plug connection (3).
Release banjo bolt (4) and detach pressure line from power steering pump.
Installation:
Replace all sealing rings.
Make sure hydraulic lines are laid without tension and with sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ .
Release screws (1, 2).
Remove power steering pump towards front.
Installation:
Screw-fastening sequence:
- Secure power steering pump with screws
- Tighten screw (2) to 2 Nm
- Tighten screws (1) to 2 Nm
- Tighten down screws (1)
Tightening torque 32 41 1AZ .
- Release screw (2) and check screw fastening point for gap freedom
- Tighten down screw (2)
Tightening torque 32 41 1AZ .
After installation:
- Fill and bleed HYDRAULIC SYSTEM
- Check pipe connections for leaks
- Carry out STEERING ANGLE SENSOR ADJUSTMENT /adjustment for ACTIVE FRONT STEERING