23 00 018 Removing and installing transmission (GS6-53DZ) N54
Special tools required:
Use only the approved gear oil.
Failure to comply with this requirement will result in serious damage to the manual transmission.
Aluminium screws/bolts are permitted with and without color coding (blue).
For reliable identification:
Aluminium screws/bolts are not magnetic .
Jointing torque and angle of rotation must be observed without fail (risk of damage) .
Necessary preliminary tasks:
- DISCONNECT BATTERY
- Remove REINFORCEMENT PLATE
- Remove EXHAUST SYSTEM
- Support engine with lifter
Remove heat shields (1) and (2).
Release bolts (1).
Disconnect connector (2).
Steel screws, tightening torque 23 00 1AZ .
Aluminium screws, tightening torque 23 00 2AZ .
Release aluminium screws with special tool 00 9 010.
Unclip cable (1) from holder.
Release screw (2) and remove holder (3).
Release bolts (1).
Remove holder (2).
Disconnect plug connection (1) from reversing light switch.
Release cable from retainers.
Supporting transmission:
Support transmission with special tools 23 4 050, 00 2 030.
Secure transmission to mounting with tensioning strap (1).
Tasks are described in TRANSMISSION BRACKET .
After completion of work, check transmission oil level.
Remove TRANSMISSION CROSS-MEMBER .
Release screws.
Remove transmission support block.
Tightening torque 22 32 2AZ .
- Remove propeller shaft from transmission.
- Release center bearing.
- Tie propeller shaft to one side.
Tasks are described in Removing PROPELLER SHAFT .
Release nuts and remove clutch slave cylinder.
Tightening torque 21 52 5AZ .
Lever out retainer (1).
Disengage shift rod (2).
Installation:
Grease shift rod.
Grease, refer to MANUAL TRANSMISSION - OPERATING FLUIDS .
Make sure shims (3) are in correct position.
Release and remove bearing pins (1) in direction of arrow.
Lift out shift arm (1).
Installation:
Grease bearing pins (1).
Grease,
refer to MANUAL TRANSMISSION - OPERATING FLUIDS .
Release screws.
Installation:
Tightening torque, steel screws 23 00 1AZ .
Tightening torque, aluminium screws 23 00 2AZ . Screws: 3/4/5/9/10 (screw 3 only present on N54).
Installation:
Secure angle of rotation special tool 00 9 120 with magnet 00 9 130 to floor plate. Screw down aluminium screws according to angle of rotation. Angle of rotation 23 00 2AZ .
Installation:
Check that dowel sleeves are correctly seated.
Replace damaged dowel sleeves.
Ensure correct position of cover plate.
Installation:
Check lubrication of transmission input shaft for sticky consistency. If grease is sticky, clean input shaft and REPLACE CLUTCH PLATE .
Check clutch plate for friction rust in splines and REPLACE if necessary.
Mechanically remove existing grease and lining abrasion from splines of clutch plate (with a cloth).
Installation:
Greasing specification:
- Remove and clean RELEASE BEARING AND RELEASE LEVER .
- Push on grease scraper ring 21 2 240 as far as it will go.
- Grease splines (1) of input shaft with a brush. refer to MANUAL TRANSMISSION - OPERATING FLUIDS .
- Detach grease scraper ring.
- Lightly grease guide sleeve for release bearing.