12 51 100 Replacing wiring harness section for ignition and injectors
Aluminium screws/bolts must be replaced each time they are released .
Aluminium screws/bolts are permitted with and without color coding (blue).
For reliable identification:
Jointing torque and angle of rotation must be observed without fail (risk of damage) .
Necessary preliminary tasks:
- Read out fault memory of DME control unit
- Switch off ignition
- Disconnect BATTERY NEGATIVE LEAD
- Remove acoustic cover
- Remove INTAKE FILTER
Unlock cover (1) with slide (3). Release screws (2).
Remove cover (1).
Unlock all plugs (1) of DME control unit and disconnect.
If necessary, unlock control unit and raise approx. 5 cm.
Press locking tab (1) in direction of arrow and pull contact carrier (2) out of housing.
Press locking tabs (1) in direction of arrow and pull contact carrier (2) out of housing.
Press locking tab (1) in direction of arrow and pull contact carrier (2) out of housing.
Release screws and remove cable duct (1).
Installation:
Replace aluminium screws.
Tightening torque 12 52 2AZ .
| Work step | (1) | ||
|---|---|---|---|
| Disconnect positive lead at jump-start connection point | |||
| Unlock plug connections on ignition coils and disconnect | Unclip capacitor | ||
| Unlock plug on injectors and disconnect | |||
| Release ground connections | |||
| Unlock plug on pressure transducers and disconnect | |||
| Unlock plug on both solenoid valves and disconnect | VANOS valves | ||
| Unlock plug on inlet and exhaust camshaft sensors and disconnect | |||
| Unlock plug for rail pressure sensor and disconnect | |||
| Unlock plug on oil pressure switch and disconnect | |||
| Unlock plug on coolant temperature sensor and disconnect | |||
| Remove FRONT UNDERBODY PROTECTION | |||
| Unlock plug on electric coolant pump and disconnect | |||
| Unlock plug on coolant thermostat and disconnect | |||
| Release ground connection on engine next to coolant pump | Tightening torque 12 52 3AZ
. Replace screw. |
||
|
NOTE:
|
|||