LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 650i 2D Convertible, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 1434 (Collision - Body Panel Repair (E70)) >> 14 Wheel Wells >> 41 14 502 Replacing Rear Left Outer Wheel Arch Section (Rear Left Side Panel Removed)

41 14 502 Replacing Rear Left Outer Wheel Arch Section (Rear Left Side Panel Removed)

WARNING: This page is about a different car, the 2010 BMW X5, 2009 BMW X5, 2008 BMW X5, and 2007 BMW X5. However, it is still accessible from the selected car via links, so may be relevant.

Read contents of Body, General  . See 41 0 CONTENTS OF BODY, GENERAL .

Spot-weld bonding is used on this vehicle. Observe specific procedure.

Remove or cover those vehicle components in the repair area which are susceptible to heat or dust.

Use only approved spot-welding apparatus for repairs!

Following new body parts are required:

Mark severance cuts in accordance with specified measurements and cut.

IMPORTANT: Cut outer metal sheet only.

Measurement a =70 mm below 15 mm dia. bore

Measurement b = 130 mm

Installation: 

Weld in reinforcement plates  at severance cuts. See 41 00... WELDING IN REINFORCEMENT PLATE (STEEL PLATE) .

Fig 2: Identifying Severance Cuts
G04791210Courtesy of BMW OF NORTH AMERICA, INC.
Fig 3: Identifying Open Weld Joints Area
G04791222Courtesy of BMW OF NORTH AMERICA, INC.

Open weld joints in areas (1).

IMPORTANT: Burn hazard!
Remove cavity acoustic baffles in area (3).

Installation: 

Apply window glass adhesive to cavity acoustic baffle (2).

Make cavity acoustic baffle (3) with cavity foam.

Mark severance cut (1) in accordance with measurement and cut.

IMPORTANT: Cut outer metal sheet only.

Dimension a = 20 mm

Open weld joints in area (2).

Fig 4: Identifying Open Weld Joints Area
G04791223Courtesy of BMW OF NORTH AMERICA, INC.

Remove cavity acoustic baffle.

Mark severance cut in accordance with specified measurement and cut.

Measurement = 20 mm distance from radius

Fig 5: Identifying Severance Cut Mark
G04791224Courtesy of BMW OF NORTH AMERICA, INC.

Cut wheel arch along line (1).

Open weld joints in area (2).

Installation: 

Weld new part in area (3) overlapping with wheel arch.

Fig 6: Identifying Open Weld Joints Area
G04791225Courtesy of BMW OF NORTH AMERICA, INC.

Preparation of new part: 

Mark new part in accordance with severance cut on vehicle + 20 mm extra material and cut (1).

Fig 7: Identifying Severance Cut Mark On Part
G04791226Courtesy of BMW OF NORTH AMERICA, INC.