Monitoring criteria
Bank 2 intake controller monitor (max. control deviation (differential spec./actual data) is 5°KW) VANOS may not be at travel limit, that is Vsa2_sprs<120°KW.
Bank 2 intake controller monitor (max. control deviation (differential spec./actual data) is 5°KW) VANOS may not be at travel limit, that is Vsa2_sprs<120°KW.