LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 135i 2D Convertible, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 987 (Gear Shift Mechanism - Repair) >> Center Shift Manual Transmission >> 25 11 111 Replacing Shift Rod Joint

25 11 111 Replacing Shift Rod Joint

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2013 BMW 128i, 2012 BMW 128i, 2011 BMW 128i, 2010 BMW 128i, and 2009 BMW 128i. However, it is still accessible from the selected car via links, so may be relevant.

Necessary preliminary tasks: 

Detach locking clip.

Fig 1: Detaching Locking Clip
G04726003Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: New retaining clips fitted as from 04.08.
Retaining clip must interlock captively with retaining web (1) behind  shift rod pin.
Fig 2: Identifying Retaining Web
G05778020Courtesy of BMW OF NORTH AMERICA, INC.

Pull shift rod (1) out of shift rod joint (2).

Installation: 

Grease shift rod pin (3).

Fig 3: Pulling Shift Rod Out Of Shift Rod Joint
G04726004Courtesy of BMW OF NORTH AMERICA, INC.

Lever spring washer (1) out of groove and push a little towards rear.

Press dowel pin (2) upwards/downwards out of shift rod joint and remove shift rod joint.

Installation: 

Grease ball of selector shaft.

Replace spring washer (1).

Fig 4: Pressing Dowel Pin
G04726029Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Check plastic washer (1) in shift rod joint (2) and replace if necessary.

Fig 5: Identifying Plastic Washer And Shift Rod Joint
G04748970Courtesy of BMW OF NORTH AMERICA, INC.