23 00 038 Installing Replacement Transmission (GS6-17BG/DG)
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2013 BMW 128i, 2012 BMW 128i, 2011 BMW 128i, 2010 BMW 128i, and 2009 BMW 128i. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
After completion of work, check transmission fluid level.
Use only the approved transmission fluid. See MANUAL TRANSMISSION - OPERATING FLUIDS .
Use only the approved transmission fluid. See MANUAL TRANSMISSION - OPERATING FLUIDS .
Failure to comply with this instruction will result in serious damage to the transmission.
Recycling:
Catch and dispose of escaping transmission fluid.
Observe country-specific waste-disposal regulations
Necessary preliminary tasks:
- Drain gear oil at oil drain plug. Tightening torque, see 23 00 4AZ in 23 00 TRANSMISSION IN GENERAL .
- Remove gearbox
Convert shift rod joint.
Push back retaining ring (1) and drive out dowel pin (2).
NOTE:
Check damping disk (6) for damage and replace if necessary.
Convert following parts from previous transmission to new transmission.
- Release bearing and release lever
- Ball pin and spring wire clip
- Studs for clutch slave cylinder
- Reversing light switch, tightening torque, see 23 11 1AZ in HOUSING WITH COVER .
Add final details to vehicle.
Check oil level.
Installation:
Observe greasing specification . See 23... Universal BMW Transmission Take-Up .