LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 135i 2D Convertible, Automatic >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine - Tightening Torques >> Supercharger With Control >> 11 65 Turbocharger And Control

11 65 Turbocharger And Control

TURBOCHARGER AND CONTROL SPECIFICATIONS

  Type Thread Description Tightening Specification
1AZ Flange nut (with internal
serrations) (8 x)
Exhaust turbocharger to cylinder head
N54 M7 Replace flange nut. 20 Nm
2AZ ASA screw (4 x)
Heat shield/retaining plate to crankcase top section
N54 M6 x 16   8 Nm
3AZ ASA screw (4 x)
Holder EPPC to cylinder head
N54 M6 x 20   9 Nm
4AZ Bracket, air duct, compressor 2, to cylinder head N54 M6 x 15   9 Nm
5AZ Vacuum reservoir to bracket for vacuum reservoir N54 M8   20 Nm
6AZ Bracket, vacuum reservoir, to body N54 M6 x 14   5 Nm
7AZ Bracket to engine longitudinal member N54 M6   5 Nm
8AZ EPPC to bracket, EPPC, with heat shield N54 M6   5 Nm
9AZ Hexagon nut (3 x)
Vacuum unit (wastegate valve) to bracket
N54 M6   8 Nm
10AZ Lock nut to vacuum unit (wastegate valve) linkage N54 M6   7 Nm
11AZ Hexagon screw (2 x)
Bracket, vacuum unit (wastegate valve), to turbocharger
N54 M8   20 Nm
12AZ Band clamp (2 x)
Charge-air duct to turbocharger.
N54 M6 Replace band clamp. 3.5 Nm