32 41 060 Removing And Installing Vane Pump (N62, N62TU) For Power Steering (From 10/2003)

IMPORTANT: Adhere to the utmost cleanliness. Do not allow any dirt to enter the hydraulic system.
Seal off pipe connections with plugs.

Necessary preliminary tasks: 

Release hose clamp and detach suction line (1) from vane pump.

Installation: 

Align suction line (1) by way of marking to connection on vane pump.

Release nut and disconnect pressure line (2) from vane pump.

Installation: 

Replace sealing ring.

Make sure hydraulic lines are laid without tension and with sufficient spacing to adjoining components.

Tightening torque 32 41 3AZ  . See STEERING AND WHEEL ALIGNMENT - TIGHTENING TORQUES .

Fig 1: Identifying Suction Line And Pressure Line
G04766905Courtesy of BMW OF NORTH AMERICA, INC.

Variant (A) - build date up to 05/2004: 

Release screws (1, 2).

Tightening torque 32 41 1AZ  . See STEERING AND WHEEL ALIGNMENT - TIGHTENING TORQUES .

Remove vane pump.

Variant (B) - build date from 05/2004: 

Release bolt (1) and nut (2).

Remove vane pump.

Installation: 

Replace self-locking nut.

Tightening torque 32 41 1AZ  . See STEERING AND WHEEL ALIGNMENT - TIGHTENING TORQUES .

Fig 2: Identifying Vane Pump Nut And Bolt
G04766906Courtesy of BMW OF NORTH AMERICA, INC.

After installation: