37 12 012 Carry Out Ride-Height-Calibration
NOTE:
Ride-height-calibration must be carried out after the following work:
- Replacement of control unit
- Replacement of wiring harness
- Replacement of ride-height sensor
Connect BMW diagnosis system.
Switch on ignition.
Carry out ride-height-calibration (menu item: "Service function").
Version with Run Flat Indicator: initialize Run Flat Indicator See 36 11 000 INITIALIZING RUN FLAT INDICATOR (RPA)
Version with Tire Pressure Control: initialize Tire Pressure Control