LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2007 >> 750Li >> Repair and Diagnosis >> Collision >> Dimensions >> COLLISION - BODY PANEL REPAIR (E65) 750i, (E66) 750Li >> 21 Side Frame And Door >> 41 21 510 Front Left Door Pillar Replacement (Front Side Panel Removed)

41 21 510 Front Left Door Pillar Replacement (Front Side Panel Removed)

Read contents of Body, General  . See 41 0 CONTENTS OF BODY, GENERAL .

Spot-weld bonding is used for the first time on the E65. A specific procedure  must be followed here.

Place vehicle on straightening bench.

Following new body parts are required:

Open weld joints in areas (1).

Remove support carrier (2).

Fig 2: Identifying Weld Joints Areas And Support Carrier
G04767314Courtesy of BMW OF NORTH AMERICA, INC.

Open weld joints in area (1).

Fig 3: Identifying Weld Joints Areas
G04767381Courtesy of BMW OF NORTH AMERICA, INC.

Mark severance cut (1) on outer entrance attachment and cut.

Measurement a = approx. 50 mm from edge of hole (2) dia. 30 mm.

Open weld joints on section (3) of outer entrance attachment.

Fig 4: Identifying Severance Cut Mark And Weld Joints On Section
G04767382Courtesy of BMW OF NORTH AMERICA, INC.

View: wheel arch, front

Open weld joints in areas (1).

Fig 5: Identifying Weld Joints Areas
G04767383Courtesy of BMW OF NORTH AMERICA, INC.
Fig 6: Identifying Measurement, Sheet Panel And Weld Joints Areas
G04767384Courtesy of BMW OF NORTH AMERICA, INC.

Mark severance cuts in accordance with specified measurements and cut.

Measurement a = approx. 150 mm before rectangular hole 10 mm x 6 mm.

CAUTION: Cut outer plate only for following severance cuts.

Measurement b = approx. 120 mm below roof edge.

Measurement c = approx. 80 mm below severance cut b.

Open weld joints in areas (1).

Installation: 

Sheet panel (2) is needed again to seal cowl.

Fig 7: Identifying Measurement, A-Pillar Bonded Areas
G04767385Courtesy of BMW OF NORTH AMERICA, INC.
CAUTION: For following severance cut, do not damage sunroof water drain hose.

Mark severance cut a and cut.

Measurement a = approx. 150 mm below roof edge.

A-pillar is bonded to inner frame in areas (1).

Preparation of new part: 

Mark new part in accordance with severance cuts above and cut.

Installation information: 

On all severance cuts, weld in reinforcing plates  approx. 30 mm long. See 41 00... WELDING IN REINFORCEMENT PLATE (STEEL PLATE) .

Apply adhesive  in areas (1). See 41 00... BONDING STEEL PARTS .

Apply window glass adhesive to cavity acoustic baffles  (2). See 41 00... INSTALLING A CAVITY BULKHEAD (EXPANDED)  or 41 00... INSTALLING A CAVITY BULKHEAD (NOT EXPANDED) .

Adjust new part to fit with straightening attachment or universal mount.

Fig 8: Identifying Adhesive Areas And Cavity Acoustic Baffles
G04767386Courtesy of BMW OF NORTH AMERICA, INC.