11 00 670 Securing Engine in Installation Position (N54)
Special tools required:
- 00 0 200
- 00 0 202
- 00 0 204
- 00 0 208
- 11 0 020
- 64 1 020
Observe following instructions relating to special tool:
- Prior to each use, check the special tools for defects, modifications and operational reliability.
- Damaged/modified special tools must not be used!
- No changes or modifications may be made to the special tools!
- Keep special tools dry, clean and free of grease.
Necessary preliminary tasks:
- Secure engine bonnet/hood in service position (See 51 00 ... SERVICE POSITION OF ENGINE HOOD/BONNET and/or 51 00 ... SERVICE POSITION OF ENGINE HOOD/BONNET )
- Remove cowl panel cover (See 51 13 116 REMOVING AND INSTALLING COWL PANEL COVER )
- Remove acoustic cover (See 51 13 116 REMOVING AND INSTALLING COWL PANEL COVER )
Only on E92, E93:
Unclip two cover caps (1) on left and right of side panel screw connection with special tool 64 1 020. (See 64 1 020 RELEASE HOOK )
Installation:
Replace damaged cover caps.
Assemble cross member 00 0 200 with special tools 00 0 202, 00 0 204, 00 0 208.
Avoid a change of engine position in the transverse or longitudinal direction.
Always make sure there is sufficient clearance between the engine (or its attachment parts) and the body.
Risk of damage!
With the aid of an assistant and the supports (2), place cross member 00 0 200 on the screw connections of the side panels.
Screw in towing hook (1) and tighten down to approx. 30 Nm.
Secure special tool 11 0 020 to spindle 00 0 202.
Fit suitable chains to special tool 11 0 020 and attach to towing hook (1) or engine lifting eye.
Danger of injury!
Tighten down all adjusting screws and nuts on cross member 00 0 200.
Unscrew nuts (1).
Raise engine approx. 10 mm with cross member.
Installation:
Replace self-locking nuts.
Tightening torque, see 22 11 2AZ in 22 11 ENGINE SUSPENSION