33 33 101 Replacing two rubber mounts for rear axle carrier
WARNING: This page is about a different car, the 2010 BMW X3, 2009 BMW X3, 2008 BMW X3, and 2007 BMW X3. However, it is still accessible from the selected car via links, so may be relevant.
Special tools required:
- 33 3 314 33 3 310 REMOVAL/INSTALLATION TOOL KIT
- 33 3 315 33 3 310 REMOVAL/INSTALLATION TOOL KIT
- 33 3 371 33 3 370 SET OF TOOLS
- 33 3 372 33 3 370 SET OF TOOLS
- 33 3 373 33 3 370 SET OF TOOLS
- 33 4 140 UNIVERSAL SUPPORT
- 33 4 142 33 4 140 UNIVERSAL SUPPORT
- 33 4 145 33 4 140 UNIVERSAL SUPPORT
- 33 4 147 33 4 140 UNIVERSAL SUPPORT
- 33 4 155 33 4 150 REMOVAL AND INSTALLATION TOOL
WARNING:
Danger of explosion!
Do not point air jet from hot air blower at fuel tank!
Do not point air jet from hot air blower at fuel tank!
Necessary preliminary tasks:
- Lower rear axle carrier, see 33 31 503 Lowering/raising rear axle carrier .
Assemble special tool 33 4 140 with 33 4 142 and 33 4 147 .
Unscrew feed handle (1). If necessary, mount extension piece (3) on special tool 33 4 145 with new screw (2).
Position special tools 33 4 140 , 33 4 155 , 33 3 371 , 33 3 372 and nut (1) on openings of rubber mount.
NOTE:
Ensure it is correctly supported on bushing of rear axle carrier.
Using a hot air blower, heat bearing bushing at max. 600°C outlet temperature for approx. 2 minutes.
Pull out rubber mount by turning special tool 33 4 155 .
Coat rubber mount with Circo Light anti-friction agent.
IMPORTANT:
Front rubber mounts differ:
Rubber mount VR = front right with elongated hole (1)
Rubber mount VL = front left
When rubber mount is fitted, arrows (2) must point down longitudinal axis of vehicle.
Rubber mount VR = front right with elongated hole (1)
Rubber mount VL = front left
When rubber mount is fitted, arrows (2) must point down longitudinal axis of vehicle.
Draw in rubber mount with special tools 33 3 314 , 33 3 315 , 33 3 372 and 33 3 373 as far as it will go.
After installation:
- Check seating of coil spring with spring pads, correct if necessary
- Perform 32 00 150 KDS CHASSIS/WHEEL ALIGNMENT CHECK WITH LOAD UP TO DESIGN POSITION