41 14 021 Replacing Front Left Wheel Arch
This instruction is only applicable the first time the wheel arch is replaced! Repeated replacement is only permitted after consultation with and approval by BMW. Should you have any questions, please contact the country-specific Hotline.
If the wheel arch has not yet been replaced, this can be recognized from the punch rivets (1) fitted at the factory.
If replacing the wheel arch, replace the punch rivets with blind rivets (2).
Read contents of BODY, GENERAL .
The steel-aluminium mixed construction is used on the vehicle.
Observe specific PROCEDURE .
Remove or cover those vehicle components in the repair area which are susceptible to heat or dust.
Use only APPROVED SPOT-WELDING APPARATUS for repairs.
Place vehicle on straightening bench.
Following new body parts are required:
- (1) Wheel arch, front
- (2) Reinforcement, support carrier
Open weld joints in area (1).
Open weld joints in areas (1).
Open weld joints in area (1).
Mark severance cut in accordance with measurement a and cut support carrier.
Measurement a=50 mm before 20 mm dia. bore
Open weld joints in area (1).
Installation:
Weld in reinforcement plate(s) at severance cut.
Open weld joints in area (1).
Drill out riveted joints in areas (1) to (3).
Open ADHESIVE JOINTS in areas (1) to (4).
Installation:
Adjust new part to fit with straightening attachment or universal mount.
In areas (2) and (3) carry over new rivet holes from engine carrier to wheel arch and drill.
Use 11 N2 RIVETS in areas (2) and (3).
Grind bonding surfaces on engine carrier blank.
Clean bonding surfaces with isopropanol or isohexane.
Installation:
New rivet positions are required for strength reasons.
Drill new rivet holes (1) as shown in picture.
In so doing, maintain a minimum distance of 10 mm to lower component edge.
Use 14 N2 RIVETS .
Glue new component with ADHESIVE K1 .
Installation:
For accessibility reasons, move rivet (1) 15 mm forwards (2).