12 51 100 Replacing wiring loom section for ignition and injectors (S63)
Necessary preliminary work:
- Read out fault code memory of the DME control unit.
- Switch off ignition
- Disconnect BATTERY EARTH LEAD .
- Remove MICROFILTER HOUSING .
- Partially release WIRING LOOM for engine.
- Remove COOLANT PIPE from cylinder head cover on left.
- Remove FUEL FEED LINE .
Lever out expanding rivet.
Remove gasket (1).
Unfasten screws (2).
Feed out partition wall (3) and remove.
Lever out expanding rivet.
Release locks in direction of arrow.
Feed out fresh-air duct (1) and remove.
Open retainers.
Release lock (1) in direction of arrow.
Remove cover (2).
Unlock and pull off all connectors from DME control unit (1).
Unlock plug on electronics box fan and disconnect.
Unlock all plugs on plug strip (2) and detach.
Unlock plug strip (2) and remove towards top.
Unlock all plugs on plug strip (3) and detach.
Unlock plug strip (3) and remove towards top.
Installation note:
When replacing wiring loom, modify plug strips (2) and (3) if necessary.
Release screws and remove retaining bracket (1).
Unlock upper section (2) of partition seal in direction of arrow and remove.
Release grommets (3) for wiring harnesses from lower section of partition seal and from electronics box.
Installation note:
Make sure grommets are correctly seated (watertightness).
Slacken nut (1).
Tightening torque 13 71 9AZ .
Remove right vacuum reservoir (2) and place to one side.
Slacken nut (1).
Tightening torque 13 71 9AZ .
Remove left vacuum reservoir (2) and place to one side.
Release screws (1).
Tightening torque 11 12 9AZ .
Release screw (2).
Tightening torque 17 10 8AZ .
Remove oil filler neck.
Cover oil filler opening with a cloth.
Release screws (1).
Tightening torque 17 10 7AZ .
Lay expansion tank with holder to one side.
Release screws (1).
Tightening torque 12 51 2AZ .
Unlock plugs on injectors and ignition coils and detach.
Release wiring harness (2).
Release wiring loom (3) and lay to one side.
Release screw (1).
Tightening torque 12 51 2AZ .
Raise cable duct (2).
Remove cable duct (1) from holder by lifting upwards.
Place wiring loom (2) to one side.
Release screws (1).
Tightening torque 12 51 2AZ .
Raise cable duct (2).
Remove COOLANT PIPE (1).
Unfasten screws (2).
Tightening torque 12 51 2AZ .
Unlock plugs on injectors and ignition coils and detach.
Lay wiring loom (4) to one side.
Feed out air wiring harness (3) and remove.
Check plug connections for correct fit.
Check stored fault message.
Clear diagnostic fault entries from fault memory.