Manual Initialization
The power-window system must always be initialized after any repair work affecting the system has been carried out.
Operation sequence:
- Press the power window switch in the open direction for at least 15 seconds but no longer than 25 seconds.
- Release the switch and then pull it to the "one-touch" close position and hold it. Initialization begins (this step is part of the CAS logic to prevent a trigger of the initialization mode if the switch is jammed).
- Hold the switch in the "one-touch" close position until initialization is completed. The windows will open and then return to the closed position to confirm a successful initialization.
- A Check Control message is issued if any of the side-windows are not initialized. The message is retracted as soon as all windows are successfully initialized.