Initialization/Reset Performance
When the control unit is powered up after a reset (such as an undervoltage < 4.5 V or by a load cutoff), different tests and initialization are performed. This system is only enabled after the tests have been successfully completed and starts to execute the control programs on a cyclical basis.
Occurring faults are stored and displayed.