12 42 Wires to starter
WARNING: This page is about a different variant/trim than selected.
STARTER LEAD TIGHTENING TORQUE SPECIFICATION (1AZ - 2AZ)
| Type | Thread | Tightening specification | Measure | |
|---|---|---|---|---|
| 1AZ Battery positive connection point in/at distributor | E32 / E34 / E31 / E36 / E46 / E87 | M8 | 20 N.m. | |
| E39 / M57 | M8 | 11 N.m. | ||
| E38 / M67 | M8 | 11 N.m. | ||
| E46 / M47TU | M8 | 11 N.m. | ||
| E60 / N62 | M8 | 15 N.m. | ||
| E65 / N62 / N73 | M8 | 15 N.m. | ||
| 2AZ Wiring harness on distributor | E36 / M41 | M8 | 10 N.m. |