Specifications & Drive Belt Routing: Specifications
COOLING SYSTEM SPECIFICATIONS
| Application | Specification | |||||
|---|---|---|---|---|---|---|
| Coolant Replacement Interval | 36 Months | |||||
| Volume | ||||||
| M60, M62 | 13.2 Qts. (12.5L) | |||||
| M70, S70, M73 | 13.7 Qts. (13.0L) | |||||
| S62 With Latent Heat Accumulator | 14.2 Qts. (13.5L) | |||||
| S62 Without Latent Heat Accumulator | 12.6 Qts. (12.0L) | |||||
| Reservoir Cap Opening Pressure (1) | 21.75 psi (1.5 kg/cm 2 ) | |||||
| Thermostat | ||||||
| Starts To Open | 176°F (80°C) | |||||
| Fully Open | (2) | |||||
| Opening Stroke | (2) | |||||
|
||||||