Coolant Ventilation Line To Cylinder Head, Removing And Installing: Installing
Install in the reverse order of removal while noting the following:
- Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Electronic Parts Information (ETKA).
- Replace the O-rings after removing them.
-- Tighten the bolt -1- to 9 Nm.
-- Tighten the bolt -arrow- -3- to 9 Nm.
-- Check the coolant. Refer to Coolant Level, Checking .