Engine Oil Cooler, Removing And Installing, 2.9L Engine: Installing
Additional procedures:
-- Install the cylinder bank 1 (right) turbocharger. Refer to TURBOCHARGER, CYLINDER BANK 1 (RIGHT), REMOVING AND INSTALLING, 2.9L ENGINE .
Additional procedures:
-- Install the cylinder bank 1 (right) turbocharger. Refer to TURBOCHARGER, CYLINDER BANK 1 (RIGHT), REMOVING AND INSTALLING, 2.9L ENGINE .