OVERVIEW - Battery -A- INSIDE ENGINE COMPARTMENT, 0K2
WARNING: This page is about a different car, the 2024 Audi A4 allroad. However, it is still accessible from the selected car via links, so may be relevant.
- Bolt
- 8 Nm
- Front Mount
- For battery tray
- Bolt
- 8 Nm
- Bracket
- Bolt
- 18 Nm
- Heat Shield Boot
- Cap
- For the ground wire
- Bolt
- Quantity: 2
- 9 Nm
- Cap
- For battery tray
- Terminal 30 Wire Junction 3 -TV28-
- Bolt
- Quantity: 2
- Tightening specification. Refer to OVERVIEW - ENGINE CONTROL MODULE .
- Mount
- For the engine control module
- Nut
- Quantity: 3
- Tightening specification. Refer to OVERVIEW - ENGINE CONTROL MODULE .
- Nut
- Quantity: 2
- Tightening specification Refer to COMPONENT LOCATION OVERVIEW - RELAY PANELS, FUSE PANELS AND E-BOXES, ENGINE COMPARTMENT G-TRON .
- Bolt
- 9 Nm
- Positive Terminal Cover
- Nut
- 5 Nm
- Main Fuse Panel
- Overview. Refer to OVERVIEW - MAIN FUSE PANEL .
- Disconnecting and Connecting. Refer to Battery -A-, REMOVING AND INSTALLING, 0K2 .
- Nut
- 6 Nm
- Nut
- 20 Nm
- Wire
- For the Battery Monitoring Control Module -J367-
- Follow the sequence when connecting the ground cable. Refer to Connecting .
- Ground Wire
- With Battery Monitoring Control Module -J367-
- Disconnecting and Connecting. Refer to Battery -A-, DISCONNECTING AND CONNECTING, 0K2 .
- Removing and installing. Refer to GROUND CABLE WITH Battery Monitoring Control Module -J367-, REMOVING AND INSTALLING, 0K2 .
- Battery -A-
- Checking. Refer to Battery, Checking .
- Removing and installing. Refer to Battery -A-, REMOVING AND INSTALLING, 0K2 .
- Bolt
- Quantity: 4
- Tightening Specifications and Sequence. Refer to Fig 2.
- Battery Tray
- Removing and installing. Refer to BATTERY TRAY, REMOVING AND INSTALLING, 0K2 .
- Nut
- Quantity: 2
- 20 Nm
- Rear Mount
- For battery tray
- Nut
- Quantity: 2
- 8 Nm
Battery Tray - Tightening Specification and Sequence (0K2)
-- Tighten the screws to 18 Nm in the sequence: -1 to 4-.