Evacuating And Charging Valve, Removing And Installing, Low And High Pressure Side: Installing
Install in the reverse order of removal while noting the following:
- Depending on the refrigerant, the evacuating and charging valves may vary. Refer to Parts Information.
-- Evacuate and charge the refrigerant circuit. Refer to Refrigerant Circuit or Working with A/C Service Station (1 Of 2) / Working with A/C Service Station (2 Of 2) .
Vehicles with High-Voltage System
-- Switch the ignition on.
-- Initiate the A/C system basic setting through the Thermal Management Control Module -J1024-, and activate the power-controlled valves through the stored routine Charge/flush the refrigerant circuit stop routine using the Vehicle Diagnostic Tester.
Continuation for All Vehicles
-- Operate the A/C system after charging the refrigerant circuit. Refer to A/C SYSTEM, STARTING AFTER CHARGING REFRIGERANT CIRCUIT .