Charge Air Cooling Pump -V188-, REMOVING AND INSTALLING, 2.9L ENGINE: Installing
Install in reverse order of removal and note the following:
- Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Parts Information.
- Used coolant cannot be used again.
-- Fill the coolant. Refer to COOLANT, DRAINING AND FILLING, 2.9L ENGINE .