Large Right Rear Coolant Pipe, Removing And Installing, 2.9L Engine: Installing
Install in reverse order of removal and note the following:
- Replace the O-rings after removing them.
- Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Parts Information.
- Used coolant cannot be used again.
-- Coat the new O-rings with coolant.
-- Install the right catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING .
-- Fill with coolant. Refer to COOLANT, DRAINING AND FILLING, 2.9L ENGINE .