LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2022 >> S7 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 89 (Turbocharger, Supercharger Servicing (2.9L & 3.0L)) >> 21 Turbocharger, Supercharger >> Charge Air System >> RECIRCULATION Valve, Removing And Installing >> RECIRCULATION Valve, Removing And Installing, 2.9L Engine >> Removing

RECIRCULATION Valve, Removing And Installing, 2.9L Engine: Removing

WARNING: This page is about a different car, the 2022 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.

Depending on the model, preliminary work may be required. Refer to Charge Air System ; Recirculation Valve, Removing and Installing.

-- Remove the oil filter element (refer to ENGINE OIL ) and cover the opening with a clean cleaning cloth.

-- Disconnect the connector and free up the wiring harness.

GWWA21-11248Courtesy of AUDI OF AMERICA, LLC
  1. For the Charge Air Cooler Temperature Sensor 2 -G764-
  2. For the Charge Air Cooler Temperature Sensor 1 -G763-

-- Remove the bolts -arrows-.

GWWA21-11249Courtesy of AUDI OF AMERICA, LLC

-- Remove the crankcase ventilation hose -2- by pressing the release buttons on both sides.

-- Move the air duct pipe -1- to the side.

Cylinder Bank 1 (Right):

GWWA21-11278Courtesy of AUDI OF AMERICA, LLC

-- Disconnect the connector -1-.

-- Remove the bolts -arrows- and remove the Recirculation Valve, Bank 1 -N625- -2-.

Cylinder Bank 2 (Left):

GWWA21-11279Courtesy of AUDI OF AMERICA, LLC

-- Disconnect the connector -2-.

-- Remove the bolts -arrows- and remove the Recirculation Valve, Bank 2 -N626- -1-.