Turbocharger, Installing
Installing
Install in reverse order of removal and note the following:
- Replace the screw-type clamp after removal.
- Replace the seals, gaskets and O-rings after removal.
- Fill the turbocharger with engine oil at the oil supply line connection.
- Check the vacuum hoses for damage before the assembly and replace if necessary.
- Used coolant cannot be used again.
-- Bring the turbocharger into the installation position, at the same time pay attention to the alignment pin.
-- Pay attention to the installation position of the vacuum hoses. Refer to Figure.
-- Install the catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING .
-- Install the front muffler. Refer to FRONT MUFFLER, REMOVING AND INSTALLING .
-- Install the air duct pipe. Refer to AIR DUCT PIPE, REMOVING AND INSTALLING .
-- Fill with coolant. Refer to COOLANT, DRAINING AND FILLING .
There are additional procedures depending on the model. Refer to TURBOCHARGER, REMOVING AND INSTALLING .
-- Check the oil level. Refer to ENGINE OIL .
- After installing the turbocharger, let the engine idle for approximately one minute without increasing the engine speed. This ensures adequate oil supply to the turbocharger.
Tightening Specifications
- Refer to OVERVIEW - TURBOCHARGER