Overview - Cylinder Head
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2023 Audi SQ8, 2023 Audi RS Q8, 2022 Audi SQ8, 2022 Audi RS Q8, and 2021 Audi SQ8. However, it is still accessible from the selected car via links, so may be relevant.
- Cylinder Head Gasket
- Replacing. Refer to CYLINDER HEAD, REMOVING AND INSTALLING .
- Installed position: the part number faces the cylinder head
- Change the coolant and engine oil after replacing
- Bolt
- 9 Nm
- Coolant Ventilation Line
- O-Ring
- Replace after removing
- Bolt
- 22 Nm
- Engine Lifting Eye
- Bolt
- 22 Nm
- Engine Lifting Eye
- Bolt
- Replace after removing
- Loosening sequence:
- Cylinder bank 1 (right). Refer to CYLINDER HEAD BANK 1 (RIGHT), REMOVING .
- Cylinder bank 2 (left). Refer to CYLINDER HEAD BANK 2 (LEFT), REMOVING .
- Tightening Specifications and Sequence:
- Cylinder Head
- Shown for cylinder bank 2 (left)
- Removing and Installing. Refer to CYLINDER HEAD, REMOVING AND INSTALLING .
- Checking for distortion. Refer to Fig 4.
- Reworking Dimensions. Refer to Fig 5.
- Pay attention to the camshaft housing pairing number and cylinder head. Refer to Figure.
- Change the coolant and engine oil after replacing
- Bolt
- Replace after removing
- Loosening sequence:
- Cylinder bank 1 (right). Refer to CYLINDER HEAD BANK 1 (RIGHT), REMOVING .
- Cylinder bank 2 (left). Refer to CYLINDER HEAD BANK 2 (LEFT), REMOVING .
- Tightening Specifications and Sequence:
- Bracket
- For the Wastegate Bypass Regulator Valve 2 -N274-
- Bolt
- Tightening specification. Refer to OVERVIEW - VACUUM PUMP (4M) , OVERVIEW - VACUUM PUMP (4MN) .
Bank 1 (Right) Cylinder Head - Tightening Specification and Sequence
- Replace bolts that were tightened with an additional turn after removing them.
-- Tighten the bolts in steps as shown:
| Step | Bolts | Tightening specification/additional turn |
|---|---|---|
| 1. | -1 through 10- | Install all the way by hand |
| 2. | -1 through 10- | 15 Nm |
| 3. | -1 through 10- | 30 Nm |
| 4. | -1 through 10- | 300° additional turn |
| 5. | -1 through 10- | Loosen 720° (2 turns) |
| 6. | -1 through 10- | 30 Nm |
| 7. | -1 through 10- | 120° additional turn |
| 8. | -arrows- | 10 Nm |
| 9. | -arrows- | 25° additional turn |
Bank 2 (Left) Cylinder Head - Tightening Specification and Sequence
- Replace bolts that were tightened with an additional turn after removing them.
-- Tighten the bolts in steps as shown:
| Step | Bolts | Tightening specification/additional turn |
|---|---|---|
| 1. | -1 through 10- | Install all the way by hand |
| 2. | -1 through 10- | 15 Nm |
| 3. | -1 through 10- | 30 Nm |
| 4. | -1 through 10- | 300° additional turn |
| 5. | -1 through 10- | Loosen 720° (2 turns) |
| 6. | -1 through 10- | 30 Nm |
| 7. | -1 through 10- | 120° additional turn |
| 8. | -arrows- | 10 Nm |
| 9. | -arrows- | 25° additional turn |
Cylinder Head, Checking for Distortion
-- Check the cylinder head at several locations for distortion using a Straight Edge - 500mm:VAS 6075 and a feeler gauge.
- Maximum permissible distortion: 0.1 mm
Cylinder Head Reworking Dimension
Reworking the cylinder head (face grinding) is only permissible to the minimum dimension -a-.
- Minimum dimension -a- = 137.95 mm