Coolant Pump, Removing And Installing: Removing
WARNING: This page is about a different car, the 2024 Audi Q5 e, 2024 Audi Q5, 2023 Audi Q5 e, and 2023 Audi Q5. However, it is still accessible from the selected car via links, so may be relevant.
-- Remove the engine cover. Refer to ENGINE COVER, REMOVING AND INSTALLING .
-- Drain the coolant. Refer to DRAIN THE COOLANT .
-- Disconnect the connectors -2 to 5-.
-- Free up the engine wiring harness -1-.
-- Remove the bolt -arrow- and the bracket -2-.
-- Disconnect the connector -1- for the Oil Pressure Switch, Level 3 -F447- -2-.
-- Remove the bolts -arrows- and remove the toothed belt guard.
-- Remove the bolts -1 through 4-, and remove the coolant pump from the Engine Temperature Control Actuator -N493-.
-- Remove the toothed belt from the coolant pump.