Turbocharger, Removing And Installing, Cylinder Bank 1 (Right) 2.9L Engine: Removing
-- Remove the upper air duct pipe (refer to AIR DUCT PIPE, REMOVING AND INSTALLING ) and pivot to the left side.
All additional procedures are described. Refer to TURBOCHARGER, REMOVING AND INSTALLING .