Turbocharger, Removing And Installing, Cylinder Bank 2 (Left) 2.9L Engine: Installing
Additional procedures:
-- Install the upper air duct pipe. Refer to Air Duct Pipe, Removing And Installing .
Additional procedures:
-- Install the upper air duct pipe. Refer to Air Duct Pipe, Removing And Installing .