Turbocharger, Removing And Installing, Cylinder Bank 1 (Right) 2.9L Engine: Removing
-- Remove the upper air duct pipe (refer to Air Duct Pipe, Removing And Installing ) and pivot to the left side.
All additional procedures are described. Refer to Turbocharger, Removing And Installing .