OVERVIEW - Battery -A-.
WARNING: This page is about a different car, the 2024 Audi SQ8, 2024 Audi Q8, 2023 Audi SQ8, and 2023 Audi Q8. However, it is still accessible from the selected car via links, so may be relevant.
- Grommet
- For the central venting system hose
- Central Venting System Hose
- Nut
- 20 Nm
- Ground Wire
- With Battery Monitoring Control Module -J367-
- Disconnecting and Connecting. Refer to Battery -A-, DISCONNECTING AND CONNECTING .
- Removing and installing. Refer to GROUND CABLE WITH Battery Monitoring Control Module -J367-, REMOVING AND INSTALLING .
- Bolt
- Nut
- 5.4 Nm
- Wire
- For the Battery Monitoring Control Module -J367-
- Follow the sequence when connecting the ground cable. Refer to Connecting .
- Positive Cable
- To the engine
- Nut
- 18 Nm
- Nut
- 7.5 Nm
- Nut
- 7.5 Nm
- Battery Cover
- Retaining Bracket
- Positive Terminal Cover
- Nut
- 25 Nm
- Bolt
- Nut
- 5 Nm
- Main Fuse Panel
- Disconnecting and Connecting. Refer to MAIN FUSE PANEL ON Battery -A-, REMOVING AND INSTALLING .
- Battery -A-
- Checking. Refer to Battery, Checking .
- Removing and installing. Refer to Battery -A-, REMOVING AND INSTALLING .
- Battery Bracket
- Nut
- 25 Nm