LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2020 >> SQ8 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 206 (Air Conditioning (Heating, Ventilation And Air Conditioning) (Component Overview - Refrigerant Circuit)) >> 87 Air Conditioning >> Refrigerant Circuit >> Refrigerant Lines With Inner Heat EXCHANGER, Removing And Installing >> Installing

Refrigerant Lines With Inner Heat EXCHANGER, Removing And Installing: Installing

WARNING: This page is about a different car, the 2024 Audi SQ7, 2024 Audi Q7, 2023 Audi SQ7, and 2023 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.
GWWA87-11740Courtesy of AUDI OF AMERICA, LLC

Install in the reverse order of removal while noting the following:

-- Replace all O-rings and coat them with refrigerant oil before installing. Refer to REFRIGERANT CIRCUIT SEALS and the Parts Information for the correct version.

-- Always clean the inner heat exchanger, pass-through, and refrigerant lines on the connection area and check them for damage.

-- Check the routing of the refrigerant lines after attachment. They must be inserted in the provided brackets in a tension-free manner and must not come in contact with other components.

-- Reinstall the removed components in the reverse order and reattach detached components.

-- Install the remaining removed components.

-- Evacuate and charge the refrigerant circuit. Refer to Refrigerant Circuit or Working with A/C Service Station .

Vehicles with High-Voltage System

-- Switch the ignition on.

-- Vehicles with Heat Pump Function, Initiate the basic setting of the A/C system through the Thermal Management Control Module -J1024- and activate the power-controlled valves using the routine Charge/flush the refrigerant circuit stop routine  using the Vehicle Diagnostic Tester .

Continuation for all vehicles

-- Operate the A/C system after charging the refrigerant circuit. Refer to A/C SYSTEM, STARTING AFTER CHARGING REFRIGERANT CIRCUIT .