LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2020 >> SQ8 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 175 (Wiring) >> 97 Wiring >> Relay Panels, Fuse Panels And E-Boxes >> Wire Junction, Removing And Installing >> Terminal 40 Wire Junction 2 -TV67-, REMOVING AND INSTALLING, 5-SEATER >> Removing

Terminal 40 Wire Junction 2 -TV67-, REMOVING AND INSTALLING, 5-SEATER: Removing

WARNING: This page is about a different car, the 2024 Audi SQ7, 2024 Audi Q7, 2023 Audi SQ7, and 2023 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.

-- De-energize the 48V system. Refer to 48V SYSTEM, DE-ENERGIZING .

-- Remove the luggage compartment floor trim panel. Refer to OVERVIEW - LUGGAGE COMPARTMENT FLOOR .

-- Release the retainer in direction of -arrow A- and open the cover -1- in direction of -arrow B-.

GWWA97-12924Courtesy of AUDI

-- Remove the nuts -7 and 8- and free up the wires -4 and 5-.

GWWA97-12928Courtesy of AUDI

-- Remove the nuts -arrows- and free up the wires -1 and 2-.

-- Remove the bolt -3-.

-- Remove the wire junction -6-.