GROUND CABLE WITH Battery Monitoring Control Module -J367-, REMOVING AND INSTALLING: Installing
WARNING: This page is about a different car, the 2024 Audi SQ7, 2024 Audi Q7, 2023 Audi SQ7, and 2023 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.
Install in the reverse order of removal while noting the following:
-- Connect the battery. Required actions. Refer to Connecting .
Vehicles with 48V System (PR Number VH2/VH3)
-- Re-energize the 48V system. Refer to 48V SYSTEM, RE-ENERGIZING .