Turbocharger, Cylinder Bank 1 (Right), Removing And Installing, 2.9L Engine: Removing
-- Remove the upper air duct pipe and pivot to the left side. Refer to AIR DUCT PIPE, REMOVING AND INSTALLING .
All additional procedures are described. Refer to TURBOCHARGER, REMOVING AND INSTALLING .