Overview - Cylinder Head
WARNING: This page is about a different car, the 2022 Audi SQ5, 2021 Audi SQ5, 2020 Audi SQ5, 2019 Audi SQ5, and 2018 Audi SQ5. However, it is still accessible from the selected car via links, so may be relevant.
- Check Valve
- For the coolant
- Cylinder Head
- Shown for cylinder bank 2 (left)
- Removing and Installing. Refer to CYLINDER HEAD, REMOVING AND INSTALLING .
- Checking for distortion. Refer to Fig 6.
- Reworking Dimensions. Refer to Fig 7.
- Change the coolant and engine oil after replacing
- Bolt
- Replace after removing.
- Loosening sequence:
- Cylinder bank 1 (right). Refer to Loosen the cylinder head bolts in the sequence -1 to 8-. .
- Cylinder bank 2 (left). Refer to Remove the bolts -arrows and 9-. .
- Tightening Specifications and Sequence:
- Engine Lifting Eye
- Bolt
- 22 Nm
- Ball Pin
- 5 Nm +45°
- For the engine cover
- Bolt
- 22 Nm
- Engine Lifting Eye
- Bolt
- Replace after removing.
- Loosening sequence:
- Cylinder bank 1 (right). Refer to Loosen the cylinder head bolts in the sequence -1 to 8-. .
- Cylinder bank 2 (left). Refer to Remove the bolts -arrows and 9-. .
- Tightening Specifications and Sequence:
- Cylinder Head Gasket
- Replacing. Refer to CYLINDER HEAD, REMOVING AND INSTALLING .
- Installed position: the part number faces the cylinder head
- Change the coolant and engine oil after replacing
- Bolt
- Replace after removing.
- Loosening sequence:
- Cylinder bank 1 (right). Refer to Loosen the cylinder head bolts in the sequence -1 to 8-. .
- Cylinder bank 2 (left). Refer to Remove the bolts -arrows and 9-. .
- Tightening Specifications and Sequence:
Bank 1 (Right) Cylinder Head - Tightening Specification and Sequence
- Replace the bolts that were tightened with an additional turn after removing them.
-- Tighten the bolts in the steps shown in the sequence:
| Step | Bolts | Tightening Specification/Additional Turn |
|---|---|---|
| 1. | -1 to 8- | Install by hand all the way |
| 2. | -1 to 8- | 30 Nm |
| 3. | -1 to 8- | 50 Nm |
| 4. | -1 to 8- | 90° additional turn |
| 5. | -1 to 8- | 90° additional turn |
| 6. | -9- | 10 Nm |
| 7. | -arrows- | 8 Nm |
| 8. | -9- | 90° additional turn |
| 9. | -arrows- | 90° additional turn |
Bank 2 (Left) Cylinder Head - Tightening Specification and Sequence
- Replace the bolts that were tightened with an additional turn after removing them.
-- Tighten the bolts in the steps shown in the sequence:
| Step | Bolts | Tightening Specification/Additional Turn |
|---|---|---|
| 1. | -1 to 8- | Install by hand all the way |
| 2. | -1 to 8- | 30 Nm |
| 3. | -1 to 8- | 50 Nm |
| 4. | -1 to 8- | 90° additional turn |
| 5. | -1 to 8- | 90° additional turn |
| 6. | -9- | 10 Nm |
| 7. | -arrows- | 8 Nm |
| 8. | -9- | 90° additional turn |
| 9. | -arrows- | 90° additional turn |
Cylinder Bank 1 (Right) Coolant Ventilation Line, Installing
- Replace the O-ring after removing.
-- Tighten the bolt -1- to 9 Nm.
Cylinder Bank 2 (Left) Coolant Ventilation Line, Installing
- Replace the O-ring after removing.
-- Tighten the bolt -arrow- for the coolant ventilation line -3- to 9 Nm.
Cylinder Head, Checking for Distortion
-- Check the cylinder head at several locations for distortion using a :VAS6075 and a feeler gauge.
- Maximum permissible distortion: 0.1 mm.
Cylinder Head Reworking Dimension
Reworking the cylinder head (face grinding) is only permissible to the minimum dimension -a-.
- Minimum dimension -a- = 138.0 ± 0.1 mm.