Turbocharger, Removing And Installing: Installing
Install in reverse order of removal and note the following:
- Replace the bolts that were tightened with an additional turn after removing them.
- Replace seals, gaskets, O-rings and self-locking nuts after disassembly.
- Coat the turbocharger stud bolts with hot bolt past. Refer to the Parts Information.
- Fill the turbocharger with engine oil at the oil supply line connection.
- Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Parts Information.
- After installing the turbocharger, let the engine idle for approximately one minute without increasing the engine speed. This ensures adequate oil supply to the turbocharger.
- Used coolant cannot be used again.
-- Install the cam adjustment actuators. Refer to CAM ADJUSTMENT ACTUATOR, REMOVING AND INSTALLING .
-- Install the catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING .
-- Install the exhaust system without tension. Refer to EXHAUST SYSTEM, INSTALLING WITHOUT TENSION .
-- Install the air filter housing. Refer to AIR FILTER HOUSING, REMOVING AND INSTALLING .
-- Fill the coolant. Refer to Coolant, Filling .
-- Oil Level, Checking. Refer to ENGINE OIL LEVEL, CHECKING AND CORRECTING IF NECESSARY .