Part I
- O-ring
- Always replace after removing.
- Coat with engine oil
- Bolt
- 9 Nm
- Coolant Supply Line
- O-Ring
- Always replace after removing.
- Coat with coolant
- Seal
- Always replace after removing.
- Nut
- Tightening specification and sequence. Refer to Fig 2.
- Always replace after removing.
- Coat the stud bolts with hot bolt paste. Refer to appropriate service information for the hot bolt paste.
- Turbocharger
- Removing and installing. Refer to TURBOCHARGER, REMOVING AND INSTALLING .
- Oil Supply Line
- Heat Shield
- There are different versions. Refer to the appropriate service information for the allocation.
- Bolt
- 9 Nm
- Nut
- 9 Nm
- Bolt
- 9 Nm
- O-Ring
- Always replace after removing.
- Coat with engine oil
- Bolt
- 9 Nm
- Bolt
- 9 Nm
- Connection
- O-Ring
- Always replace after removing.
- Bolt
- 9 Nm
Turbocharger - Tightening Specifications and Sequence
- Replace the nuts after removing.
-- Tighten the bolts in steps in the sequence shown:
| Step | Nuts | Tightening Specifications |
|---|---|---|
| 1 | -1 and 2- | 10 Nm |
| 2 | -3 and 4- | 25 Nm |
| 3 | -1 and 2- | 25 Nm |