Turbocharger, Removing And Installing: Installing
Install in reverse order of removal and Note The Following:
Replace the bolts that were tightened with an additional turn after removing them.
Replace seals, gaskets, O-rings and self-locking nuts after disassembly.
Coat the turbocharger stud bolts with hot bolt paste. Refer to the Parts Information.
Fill the turbocharger with engine oil at the oil supply line connection.
Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Parts Information.
-- Install the catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING .
-- Check the oil level. Refer to ENGINE OIL .
-- Connections and wire routing. Refer to the appropriate Wiring Diagram(s).
After installing turbocharger, let engine idle for approximately one minute without increasing the engine speed. This ensures adequate oil supply to the turbocharger.
Used coolant cannot be used again.
-- Fill the coolant. Refer to COOLANT SYSTEM/COOLANT .
There are additional procedures depending on the model. Refer to TURBOCHARGER .