LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2018 >> A6 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 106 (Emission Control System (Service Information)) >> PCV Valve >> Installation [08/2013 - ] >> Installation [08/2013 - ]

Installation [08/2013 - ]

WARNING: This page is about a different car, the 2014 Lexus ES 300h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY 
    1. Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

      Adhesive

      Toyota genuine adhesive 1324, three bond 1324 or equivalent

    2. Using a 19 mm deep socket wrench, install the ventilation valve sub-assembly to the ventilation case sub-assembly.

      Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf) 

    3. Install the No. 2 ventilation hose to the ventilation valve sub-assembly.
  2. INSTALL INTAKE MANIFOLD 

    Refer to INSTALLATION [08/2013 - ]