LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2017 >> S7 Premium Plus >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine System (Cylinder Head & VALVETRAIN - Service Information - 4.0L - CEUC, CRDB, CTGE, CWUB, CWUC) >> Cylinder Head, VALVETRAIN >> VALVETRAIN >> Camshaft, Removing And Installing >> Installing >> Continuation for Both Cylinder Banks

Continuation for Both Cylinder Banks

GWWA15-11095

-- Check the location of the compressor ring ends.

-- Clean and insert the oil screen -arrow-.

GWWA15-11336
GWWA15-11338
CAUTION:

The engine could be damaged.

  • Bring the pins of all camshaft adjustment actuators into the installation position.

-- Press down the camshaft adjustment actuator pins by hand -arrow-.

NOTE:

Note the expiration date of the sealing compound.

-- Cut the tube nozzle at the front marking (nozzle diameter: about 2 mm).

GWWA17-0081
CAUTION:

Risk of contaminating camshaft bearing with excess sealant.

  • Do not apply sealant beads thicker than indicated.


NOTE:

Install the lower section of the camshaft housing within five minutes of applying the sealant.

-- Lay the camshaft housing on the cylinder head.

NOTE:

Ensure that the camshafts can be inserted in the camshaft housing axial bearing without force.

-- Insert the :T40116  into the camshaft housing and cylinder head.

GWWA15-11256

-- Tighten the bolts for the camshaft housing. Refer to Tightening Specifications .

GWWA15-12254
NOTE:

The cylinder head for cylinder bank 2 (left) is shown.

The sealant must harden for approximately 30 minutes after installing the camshaft housing.

-- Remove the :T40116  with the :T10133/3  .

GWWA15-11257