Turbocharger, Removing And Installing, Vehicles With A Turbocharger: Installing
Install in reverse order of removal. Note the following:
Replace the seals and O-rings.
Fill the turbocharger with engine oil at the oil supply line connection.
Secure all hose connections with hose clamps of the same type as those equipped by the factory.
To ensure the turbocharger is supplied with enough oil, let the engine run at idle for approximately 1 minute after installing the turbocharger. Do not increase the engine speed during this time.
-- Electrical connections and wiring routing. Refer to the applicable Wiring Diagrams.
-- Install the EGR pipe. Refer to EGR Pipe At The Turbocharger Tightening Specifications And Sequence .
-- Install the air guide pipe. Refer to OVERVIEW - CHARGE AIR SYSTEM, VEHICLES WITH TURBOCHARGER .
-- Install the particulate filter. Refer to PARTICULATE FILTER, REMOVING AND INSTALLING .
-- Install the lock carrier cover. Refer to LOCK CARRIER COVER, REMOVING AND INSTALLING .