Part I
- O-Ring
- Replace after removing.
- Coat with engine oil.
- Bolt
- 9 Nm.
- Coolant Supply Line
- O-Ring
- Replace after removing.
- Coat with coolant.
- Seal
- Replace after removing.
- Nut
- Replace after removing.
- Coat the stud bolts with hot bolt paste. Refer to Parts Information for the hot bolt paste.
- Tightening specification and sequence. Refer to Fig 2
- Turbocharger
- Removing and Installing. Refer to TURBOCHARGER, REMOVING AND INSTALLING .
- Oil Supply Line
- Heat Shield
- There are different versions. Refer to the Parts Information for the allocation.
- Bolt
- 9 Nm.
- Nut
- 9 Nm.
- Bolt
- 9 Nm.
- O-Ring
- Replace after removing.
- Coat with engine oil.
- Bolt
- 9 Nm.
- Installed, depending on the version.
- Bolt
- 9 Nm.
- Connection
- O-Ring
- Replace if damaged or leaking.
- Bolt
- 9 Nm.
Turbocharger - Tightening Specifications and Sequence
- Replace the nuts after removing.
-- Tighten the bolts in steps in the sequence shown:
| Step | Nuts | Tightening Specifications |
|---|---|---|
| 1 | -1 and 2- | 10 Nm |
| 2 | -3 and 4- | 25 Nm |
| 3 | -1 and 2- | 25 Nm |